For many product teams, “usability testing” is something that happens at the very end of the development cycle—a final quality check to catch bugs before a product is shipped. This is a dangerous and outdated approach. While late-stage testing is better than no testing at all, waiting until your product is fully coded means that discovering a foundational flaw is incredibly expensive to fix, requiring costly design and engineering rework.
The modern, agile approach is to treat usability testing not as a single event, but as a continuous process. At Cardinal Peak, our usability testing services are built on the philosophy of testing early and often. The real question isn’t when is the right time to test, but rather, what should we be testing at each stage of the product lifecycle?
Integrating usability testing across the entire product lifecycle—from concept to post-launch—dramatically reduces the cost and risk of building the wrong product.
Contents
The Concept Stage: Testing the Idea
The cheapest time to fix a problem is before any significant design or development has even begun. As soon as you have low-fidelity wireframes or even a paper sketch of a user flow, you can start testing. The goal here is not to test the visual design, but the core concept itself. Do users understand the value proposition? Can they navigate the basic flow? Insights from user testing at this stage can validate or redirect your entire product strategy for a fraction of the cost of making changes later.
The Design Stage: Testing the Prototype
Once the user flows are validated, the next step is to test a high-fidelity, interactive prototype from a tool like Figma. This is where you can refine the specifics of the user interface and interaction design. You can get detailed feedback on:
- Layout and visual hierarchy
- Clarity of icons and labels
- Ease of completing specific tasks
Making changes in a design file is infinitely faster and cheaper than making them in a coded product. This is a crucial part of our UX research process.
The Development Stage: Testing the Code
Once the product is in active development, testing should continue on early builds or beta versions. This is where you can assess the real-world performance of the product. Is it fast and responsive? Does it work as expected on the actual target hardware? This stage of product testing services helps identify usability issues that only become apparent in a live, coded environment.
The Post-Launch Stage: Testing for Optimization
Usability testing doesn’t end at launch. A successful product is one that continuously evolves based on real-world user data. After launch, testing can be used to validate new features, optimize existing workflows, and ensure the product continues to meet the changing needs of your users.
Conclusion: From a Final Check to a Continuous Process
The “right time” for usability testing is at every stage of your product’s lifecycle. By embracing this continuous and iterative approach, you transform testing from a costly, late-stage quality check into a powerful strategic tool for risk mitigation. By partnering with Cardinal Peak, you can build a testing strategy that saves money, reduces waste, and results in a fundamentally better product.
Build a Strategic Testing Plan for Your Product
Don’t wait for launch to discover what works. Let our experts help you integrate a continuous usability testing process into your product lifecycle. We’ll help you mitigate risk, save on rework, and build a product your users will love. Develop your testing strategy.